What to ask a landscape contractor before you sign.
We've been designing yards since 1996. Here's what we'd ask, and what we'd watch for.
1. Who actually does the work?
Ask: do you have employees who've been with you a long time and do the work themselves? And do you have subcontractors you know and trust for the work your employees don't do?
A worrying answer sounds like this: no steady employees, just people hired here and there, and subcontractors they don't really know.
2. Can you show me what it will look like?
The biggest mistake we see is hiring someone with no design ability. They can take the same materials and make everything awkward, because they don't understand how a yard flows.
Plenty of salespeople sound great. They tell you everything you want to hear.
Ask to see your project in 2D and 3D before you sign.
3. Do they listen?
One word matters more than any other in a first meeting: listen.
A good designer finds out what you want, what matters to you and what you can afford. Something that stays within your budget and makes your life better. It's fine to call while you're still figuring it out. Finding that out is their job.
4. Why is this bid so low?
Work done properly costs about the same: the same labor and the same materials. So when one bid is far lower than the others, ask what gives.
Usually they're cutting corners: on labor, on materials, on insurance, or on who shows up at your home. If a contractor wants to be paid in cash or hides payments, that may not seem like your problem. But someone who cuts corners there often cuts them on insurance too, and that is your problem.
Anyone can come in at a lower price. Not everyone can deliver a great result.
We're not saying always, but the higher bidder is often the one who is fully insured, warranties the work, and doesn't run when something goes wrong.
5. When is each payment due?
Payments should follow finished work, not come before it.
- "Due on delivery of materials" means the materials are on your property. Delivered, not ordered.
- "Due when the deck is complete" means you've looked at the deck and agree it's complete.
The red flag is front loading: asking for most of the money before the work is done.
In California, the law limits a down payment to $1,000 or 10 percent of the contract price, whichever is less. Other states have their own rules, so check yours.
6. Is the license real?
Get the license number and look it up. Most states have an online license check you can use from your phone.
It shows whether the license is active, who holds it, and whether they carry a bond and workers' compensation, or are exempt because they have no employees. Ask about liability insurance too.
One more thing
Sometimes the unhappy project starts with the homeowner: not knowing what they wanted until it was built, then not liking it after spending a lot of money.
That's why seeing a design first matters. For $9.99, you can see yours, with a budget and a brief, before anyone comes out.
Know what you want before anyone comes out.
Add one photo of your yard. In about 2 minutes you see it redesigned, with a planning budget. The full package adds a brief you can send every contractor, so each bid covers the same work.
Start with a photo of your yardFirst look at no cost. Full package $9.99 one time. No subscription.
Licensed C-27, CSLB #1123222. Designing yards since 1996. No sales calls. We only reach out if you ask us to.